Destination briefing
Why travelers stop here
Incheon Port International Passenger Terminal was built to resolve user inconvenience caused by the dual operation (inner port and coastal port) and to increase port operation efficiency, thereby developing Incheon Port into an international tourism port. Construction began in December 2016, was completed in June 2019, and operations started on June 15, 2020. The total floor area is 66,789.62㎡ (terminal building 65,421.15㎡, gate building 1,368.47㎡), consisting of the 1st to 5th floors and a rooftop floor.
Address: 57, Gukjehangman-daero 326beon-gil, Yeonsu-gu, Incheon (Songdo-dong)
OTA-ready stop
Built into inbound routes and day-tour planning.
Local context
인천광역시 연수구 국제항만대로326번길 57 (송도동)
Travel fit
Attraction · Incheon



